P3 Shell Roof (NS Beams)
Structure for arched concrete shell roofs whose beams run north to south, built for the low load capacity of these roofs.

FERO design drawings. Photos of installed structures are on the project pages linked below.
Shell roofs, the arched concrete roofs common on mills and sheds, carry little extra load. P3 is designed for a low added load and follows the north to south beam direction. It is SS400 iron, hot-dip galvanized to ASTM A123 with a 90 micron coating, and is supplied galvanized only. Final loading is checked against the roof's capacity during design.
P3 Shell Roof (NS Beams) specifications
FERO P3 Shell Roof (NS Beams)
10 year warranty| Application | Shell roof with north to south beams |
|---|---|
| Material and grade | SS400 iron |
| Coating | Hot-dip galvanized to ASTM A123, 90 microns |
| Fasteners | Galvanized for the structure, SS304 for the modules |
| Inclination | 10 to 45 degrees, customizable |
| Design wind speed | 35 m/s (126 km/h), customizable |
| Warranty | Every FERO structure carries a 10 year warranty, galvanized iron and anodized aluminium alike. Galvanized iron is hot-dip coated to ASTM A123 at 90 microns, the basis of the warranty. Ask us for the written terms and we will send them with your quotation. |
Member sizes, spans and foundations are designed for each project. Not sure which structure fits your site? Read the guide to solar structure types.
Common questions
What does NS beams mean?
The roof beams run north to south. P3 is engineered for that geometry, and roofs with east to west beams take the P2 shell roof structure.
Will this overload my existing shell roof?
The design targets a low added load on typical shell roofs. Final loading is verified against your roof's capacity during engineering, and a structural engineer should confirm that capacity.
How is this different from the EW beams version?
Beam direction changes the load path and the fixing details. Use P3 for north to south beams and P2 for east to west beams.
Related structures in this range
Your site assessment is free.
Your quote arrives in 48 hours.
Tell us your site location and monthly consumption. GFE's engineers will send a preliminary sizing and cost estimate within two business days.