Shell Roof Solar Mounting StructuresFERO-P2-SHELL-EW

P2 Shell Roof (EW Beams)

Structure for shell roofs whose beams run east to west, designed for a low added load on the existing roof.

Download Catalogue
P2 shell roof solar structure for east to west beams, FERO design drawing

FERO design drawings. Photos of installed structures are on the project pages linked below.

P2 shell roof is the east to west beam version of the FERO shell roof range, for factories, warehouses and agricultural sheds with shell roofs. It is designed for the low load capacity of shell roofs and follows the beam direction. It is SS400 iron, hot-dip galvanized to ASTM A123 with a 90 micron coating, and is supplied galvanized only.

Specifications

P2 Shell Roof (EW Beams) specifications

FERO P2 Shell Roof (EW Beams)

10 year warranty
FERO P2 Shell Roof (EW Beams)
ApplicationShell roof with east to west beams
Material and gradeSS400 iron
CoatingHot-dip galvanized to ASTM A123, 90 microns
FastenersGalvanized for the structure, SS304 for the modules
Inclination10 to 45 degrees, customizable
Design wind speed35 m/s (126 km/h), customizable
WarrantyEvery FERO structure carries a 10 year warranty, galvanized iron and anodized aluminium alike. Galvanized iron is hot-dip coated to ASTM A123 at 90 microns, the basis of the warranty. Ask us for the written terms and we will send them with your quotation.

Member sizes, spans and foundations are designed for each project. Not sure which structure fits your site? Read the guide to solar structure types.

Portfolio

Installed references

FAQ

Common questions

Which sites need the EW beams shell roof structure?

Industrial and warehouse roofs whose main beams run east to west. Matching the structure to the beam direction keeps the fixings aligned with the beams.

What material and coating are used?

SS400 iron, hot-dip galvanized to ASTM A123 with a 90 micron coating. Structure fasteners are galvanized and module fasteners are SS304.

Can the wind design be raised for exposed sites?

Yes. The standard basis is 35 m/s (126 km/h), and it is raised to suit exposed or coastal sites.

Your site assessment is free.
Your quote arrives in 48 hours.

Tell us your site location and monthly consumption. GFE's engineers will send a preliminary sizing and cost estimate within two business days.

Contact Us