P3 Elevated Shed
Three-leg elevated structure for larger flat roof arrays. It clears rooftop obstacles and carries wider spans.

FERO design drawings. Photos of installed structures are on the project pages linked below.
P3 does the same job as the P2 elevated shed in a three-leg layout, for larger arrays and wider roof spans on commercial flat roofs with obstacles. Depending on the design height and site rules, it can leave walkable or serviceable space under the array. It is SS400 iron, hot-dip galvanized to ASTM A123 with a 90 micron coating, or painted.
P3 Elevated Shed specifications
FERO P3 Elevated Shed
10 year warranty| Application | Flat roof |
|---|---|
| Material and grade | SS400 iron |
| Coating | Hot-dip galvanized to ASTM A123, 90 microns, or painted |
| Fasteners | Galvanized for the structure, SS304 for the modules |
| Inclination | 10 to 45 degrees, customizable |
| Design wind speed | 35 m/s (126 km/h), customizable |
| Warranty | Every FERO structure carries a 10 year warranty, galvanized iron and anodized aluminium alike. Galvanized iron is hot-dip coated to ASTM A123 at 90 microns, the basis of the warranty. Ask us for the written terms and we will send them with your quotation. |
Member sizes, spans and foundations are designed for each project. Not sure which structure fits your site? Read the guide to solar structure types.
Common questions
Why choose the P3 elevated shed over P2?
Specify P3 when the array width or span needs the three-leg layout for stiffness on larger commercial roofs.
Does elevation create usable space below?
It can. Depending on the design height and site rules, an elevated layout can leave walkable or serviceable space under the array.
Is the structural design site-specific?
Yes. Height, inclination and wind design are set from the roof obstacles, the roof's load capacity and local wind data.
Related structures in this range
Your site assessment is free.
Your quote arrives in 48 hours.
Tell us your site location and monthly consumption. GFE's engineers will send a preliminary sizing and cost estimate within two business days.