P2 Pile Driven
Pile-driven SS400 ground-mount structure for rapid deployment where soil conditions allow — no concrete piles required on suitable sites.

Structure details
- Site Adaptability
- Quick Deployment
- Heavy-Duty Build
- High Load Capacity
The P2 Pile Driven Ground Mount Structure is designed for swift, hassle-free ground-mount deployment. Purpose-built for projects demanding efficiency and durability, it offers rapid installation without compromising structural integrity. The pile-driven foundation eliminates the need for concrete, reducing both installation time and cost significantly on suitable soil types.
Common questions
What sites suit a P2 pile-driven solar structure?
Sites with soil that accepts pile driving. Where rock or loose sand make driving impractical, specify P2 Concrete Pile instead.
What coating does P2 Pile Driven use?
SS400 iron hot-dip galvanized to ASTM A123, with HDG structural fasteners and SS304 module fasteners.
Are foundation details fixed or customisable?
Foundation type, inclination, and wind rating are engineered per site as standard FERO practice.
Related structures in this range
Your site assessment is free.
Your quote arrives in 48 hours.
Tell us your site location and monthly consumption — GFE's engineers will have a preliminary sizing and cost estimate to you within two business days.