P2 Concrete Pile
Ground mount on concrete piles, for rocky or sandy soil where pile drivers are not suitable.

FERO design drawings. Photos of installed structures are on the project pages linked below.
P2 concrete pile shares its frame and materials with P2 pile driven and changes the foundation. Concrete piles give a stable base on rocky or sandy ground where driving piles is not practical. The structure is SS400 iron, hot-dip galvanized to ASTM A123 with a 90 micron coating, with galvanized structure fasteners and SS304 module fasteners. The foundation is set from the soil bearing capacity and the load at the site.
P2 Concrete Pile specifications
FERO P2 Concrete Pile
10 year warranty| Application | Ground with rocky or sandy soil |
|---|---|
| Material and grade | SS400 iron |
| Coating | Hot-dip galvanized to ASTM A123, 90 microns |
| Fasteners | Galvanized for the structure, SS304 for the modules |
| Inclination | 10 to 45 degrees, customizable |
| Design wind speed | 35 m/s (126 km/h), customizable |
| Warranty | Every FERO structure carries a 10 year warranty, galvanized iron and anodized aluminium alike. Galvanized iron is hot-dip coated to ASTM A123 at 90 microns, the basis of the warranty. Ask us for the written terms and we will send them with your quotation. |
Member sizes, spans and foundations are designed for each project. Not sure which structure fits your site? Read the guide to solar structure types.
Common questions
When do I need concrete piles instead of driven piles?
When the soil is too rocky or too sandy for reliable pile driving. Concrete piles give a stable foundation on that ground.
What wind speed is it designed for?
The standard design basis is 35 m/s, about 126 km/h. Coastal and exposed sites can need a higher basis, set from the site location and the height of the structure.
Is this the same product as P2 pile driven?
Same frame and materials, different foundation. Choose the foundation that matches the soil at your site.
Related structures in this range
Your site assessment is free.
Your quote arrives in 48 hours.
Tell us your site location and monthly consumption. GFE's engineers will send a preliminary sizing and cost estimate within two business days.