All ProjectsAutomation & Control
Lasbela University
Lasbela, BALOCHISTAN
830 KWp
Commissioned May 2024
Education
Project Gallery
1 / 1
Multiple Images
Project Overview
This system includes one HT grid connection with an HT meter installed to manage three different departments located at separate sites. Three controllers are deployed to coordinate system operations, while some inverters are integrated through RTUs. The site is supported by three generators with capacities of 100 kVA, 200 kVA, and 350 kVA. All components are connected through the controllers, and each generator is synchronized with its own department and solar system.
Key Highlights
- Integrated 4 generators into the system to optimize fuel consumption and improve overall energy efficiency
- Integrated with Energy Monitoring for real-time tracking
Project Details
- Client
- Confidential
- Sector
- Education
- System Type
- Automation
- Capacity
- 830 KWp
- Location
- Lasbela, BALOCHISTAN
- Commissioned
- May 2024
Interested in a similar solution? Explore our automation & SCADA services.