Project Overview

This beverage site consists of three plants with capacities of 2000 kW, 700 kW, and 300 kW. A single datalogger manages the site, while the remaining inverters are connected and monitored through RTUs. All three plants are connected to separate grids, and in the event of generator operation, five generators handle the entire site load. The system has a strict 1 MW export limit, which is precisely managed by Elum controllers to prevent grid penalties. A monitoring platform also gives real-time supervision of energy across all plants.

Key Highlights
  • Coordinated PV-DG control has been implemented to make the most of solar energy while keeping the generators running efficiently, for reliable, lower-cost operation of the whole system.
  • The system actively controls both import from and export to the grid, keeping the site within grid limits.
  • Commissioned 3 MW of Huawei inverters, each rated at 115 kW, integrated into one system across the site.
Project Details
Client
Confidential
Sector
Food & Beverage
System Type
Automation
Capacity
3 MWp
Location
Islamabad, ISLAMABAD
Commissioned
March 2024

Interested in a similar solution? Explore our automation & SCADA services.